    Read the site

    Chapter 4 · Read the site

    Read the site

    Before entering a site, follow its entry arrangements and select and use the required personal protective equipment. Reading a plan online does not demonstrate that you can use the required PPE on site.

    To orientate the plan, identify its north arrow and reliable reference features. Align the plan with the site, then connect the boundary, building position, access and other nominated features with what you can identify at the site.

    Use the site plan and associated drawings to locate services and key features. Report missing, unclear or inconsistent information. A service drawn on a plan does not by itself establish the exact field location or permission to excavate.

    Worked example: In a supervised training scenario, identify the street frontage and a confirmed boundary reference. Use these with the north arrow to orientate the plan. Then locate the nominated features. If the apparent site arrangement does not match the drawing, stop and clarify it.

    Banksia existing site plan: north up, southern public frontage, 28000 by 40000 millimetre lot, 3200 millimetre drive, rear level 100.00 and frontage level 98.80 on a fictional local datum.Open full-size illustration
    Banksia · site and environmental reference plan — Read the site, legend, title block and environmental references together.
    About this illustration and its limits

    A101 places the main building and detached garage inside the lot. DP1 is a drain pit at the low southern frontage; T1 is the eastern retained tree and RW1 the rear garden wall. The legend identifies DB as distribution board and the service line abbreviations. Services are indicative and unconfirmed. Read ENV01 for environmental instructions and SP01 for project requirements.

    Existing-condition drawing for a fictional training project, R04, 16 September 2026. Not for construction. Use written dimensions; do not scale a resized screen image. Open the full-size drawing to read the title block and legend.

    Source: Onshift · Banksia and Riverbend teaching drawings and initial records

    Riverbend existing site plan: north up, 160000 by 220000 millimetre site, 8000 millimetre drive and southern public frontage; rear level 42.00, frontage 39.00 and floor 40.00 on a fictional local datum.Open full-size illustration
    Riverbend · site reference plan — Locate the frontage and north before changing sheets.
    About this illustration and its limits

    Keep this C4 project separate from Banksia C1. Riverbend uses SP04 and ENV04. Its site north arrow points up; the floor plan S201 rotates the presentation. Service status and capacity remain unconfirmed.

    Existing-condition drawing for a fictional training project, R04, 16 September 2026. Not for construction. Use written dimensions; do not scale a resized screen image. Open the full-size drawing to read the title block and legend.

    Source: Onshift · Banksia and Riverbend teaching drawings and initial records

    Riverbend floor plan: north points right; 100000 by 36000 millimetre fabrication floor; numbered grids 1 to 11, office and mezzanine at one end, crane runway above and end bracing.Open full-size illustration
    Riverbend · rotated floor plan and grids — Use the north arrow instead of assuming page top is north.
    About this illustration and its limits

    Here dashed lines mean overhead or bracing according to this legend. RC means reinforced concrete, B beam and C column. A–A and B–B refer to A301 and A302. The geometry is stipulated; the drawing gives no member capacities.

    Existing-condition drawing for a fictional training project, R04, 16 September 2026. Not for construction. Use written dimensions; do not scale a resized screen image. Open the full-size drawing to read the title block and legend.

    Source: Onshift · Banksia and Riverbend teaching drawings and initial records

    Look, listen and practise

    Turn the plan to match the place

    Explain orientation and recognise the difference between a plan location and a verified site condition.

    Study the drawing

    Locate a feature on the full sheet, then read its enlarged detail.

    C1-A101 — revision R04 · 16 September 2026

    Fictional existing-condition drawing. Not for construction. Dimensions are in millimetres unless noted; levels are in metres on a fictional local datum. Use written dimensions, not screen measurements.

    Where to look

    The numbered markers point to features on the full sheet. Hover or focus a marker to locate it. Tap, click or press Enter to open its explanation and enlarged detail. The named buttons above do the same thing.

    Choose a numbered marker or a named feature to locate it on the sheet.

    Banksia existing site plan: north up, southern public frontage, 28000 by 40000 millimetre lot, 3200 millimetre drive, rear level 100.00 and frontage level 98.80 on a fictional local datum.
    Open original full-size C1-A101 R04
    Read the sheet in text

    A101 places the main building and detached garage inside the lot. DP1 is a drain pit at the low southern frontage; T1 is the eastern retained tree and RW1 the rear garden wall. The legend identifies DB as distribution board and the service line abbreviations. Services are indicative and unconfirmed. Read ENV01 for environmental instructions and SP01 for project requirements.

    Read a proposed building

    SO01 adds a small proposed site office to the fictional BP-01 yard. Follow the same building through its plans, elevations, section and schedules.

    Fictional teaching supplement · R01, 17 October 2026. Use the edition assigned by your assessor. BP-01 remains the assessed path project; these sources do not add a new practical task or authorise construction.

    SO-A101 — Proposed site-office location · A3 at 1:100

    Use the site plan to locate the proposed office in relation to boundaries, the path and retained yard features.

    Explore this source

    The numbered markers point to features on the full sheet. Hover or focus a marker to locate it. Tap, click or press Enter to open its explanation and enlarged detail. The named buttons above do the same thing.

    Choose a numbered marker or a named feature to locate it on the sheet.

    Open SO-A101 with complete text equivalent · Open original full-size SO-A101

    Reading limit: A plotted position does not establish service clearance, a usable entrance or permission to build.

    Door, window and finish schedules · Specification · Issue register

    Download all four A3 drawings (PDF) · Study guide and worked examples

    Narrated lesson

    CHAPTER 5 · LessonTurn the plan to match the place
    0:000:57
    MattyOnshift's AI · AI narration · Segment 1 of 1 · Saved on this device

    AI narration · transcript available. Pause to inspect the drawing when prompted. Your listening position is saved on this device; it is not assessment evidence.

    Download this lesson audio

    Read the lesson transcript

    A drawing can be rotated to fit a sheet. The page edge is not a compass. When you can look at the two teaching plans, find their north arrows. Banksia's site plan has north at the top. Riverbend's floor plan points north to the right. If you keep both pages upright and assume the top is north, one interpretation will be wrong. On a work site, begin with the entry instructions and required protective equipment. Use reliable reference points to relate the plan to the physical area. Locate the nominated boundaries, features and service information within the authorised task. A service line on a plan does not prove its exact underground position or its isolation. Pause and explain how you would align Banksia's southern frontage with a work area. This is preparation. Your practical assessment requires the actual actions in an arranged workplace or close simulation, observed by your assessor.

    Worked example: Site-plan basics

    Identify the orientation and reference features shown in the site-plan example. Then compare the north arrow and frontage on the supplied teaching plan.

    Optional example hosted on TikTok. You can also use the lesson explanation and drawings.

    Open Site-plan basics on TikTok (new tab)

    Find it in the source

    Find north on both sheets. Banksia A101 has north up; Riverbend S201 has north toward the right of the page.

    Try it yourself

    Which direction is Banksia's public frontage? Would keeping every page upright correctly orientate both plans?

    Practice only. Your notes clear when you change topics or leave this page. They are not saved or submitted as assessment evidence.

    Read this section in the full Field Book (new tab — your course stays open here)
    Learning

    Read the site

    Use the reading above, then apply it to the situation and task below.

    Read the matching fieldbook section

    Scenario

    Explain safe site-plan use

    Work within the authority and safety arrangements for your role.

    You need to relate a site plan to the actual work area.

    Question

    Explain safe site-plan use

    Situation

    You need to relate a site plan to the actual work area.

    Answer in your own words using the question and sources. This written explanation is separate from the project portfolio and observed practical task.

    Explain your site-entry and PPE checks, how you orientate the plan, and how you locate boundaries, key features and services. Explain what a marked service does and does not establish.

    Type your answer, or use your device's dictation to speak it into this box. Check the text before submitting.

    Help with this answer (optional)

    Describe the process and reliable reference points. This explanation does not replace the observed practical task.

    Read the matching fieldbook section

    Check my answer (preview only — disabled). Show example layout

    Synthetic example — layout demonstration only. Not AI output, not stored, not evidence.

    What is clear

    • Example layout only: the response identifies the project records being compared.

    What to develop

    • Example layout only: explain how you establish the authorised issue and report the inconsistency.

    A question to think about

    Which record would confirm the current authorised issue?

    Read more in the Field Book

    Teaching feedback only. It is not a mark or a result; your assessor decides the outcome.

    Optional help and learning for this task

    Read the matching fieldbook section

    Task wording as issued

    Explain your site-entry and PPE checks, how you orientate the plan, and how you locate boundaries, key features and services. Explain what a marked service does and does not establish.

    Preview only — disabled. A learner sends from the evidence page.

    What to submit

    Your own written explanation.