Construction drawings / SO01 site office

Proposed site-office location

SO-A101R0117 October 2026BP-01 / SO01

Fictional training document. Use the edition assigned by your assessor. Not for construction or site access.

SO-A101: Proposed site-office location. Complete structured text equivalent follows.
SO-A101 R01, 17 October 2026. A3 at 1:100. Fictional training source; use your assigned edition.

Identity, orientation and coordinates

SO-A101 R01, 17 October 2026. A3 landscape at 1:100. Southwest BP-01 corner (0,0); east and north in millimetres; north up; levels in metres on the BP-01 fictional local datum, not AHD. The boundary is 12000 east-west by 16000 north-south.

Complete site reading

ItemSource fact
SO01 outside facesE5000-10000; N12000-15000. Overall 5000 east-west x 3000 north-south.
Setbacks1000 to north boundary; 2000 to east boundary; 5000 to west boundary.
D01 entry locationSouth wall opening E8500-9500 at N12000. Door faces EA2.
PW01 pathE8250-9750 / N2000-10000; 1500 wide x 8000 long.
EA1 / EA2 apronsEA1: E8000-10000 / N0-2000. EA2: E8000-10000 / N10000-12000.
T01 protected zoneCentre E2500/N11000; radius 2000. No new disturbance permission.
Water route / markerIndicative route E10500 from N0 to N14000; WM01 at E10500/N3000. Route 500 east of office face; status/depth unverified.
SW01 / DP01Swale centreline E7400 from N2000 to N10000. Drain pit DP01 at E7400/N1200.
Environmental areas retainedMS01: E1000-3500/N2000-4500. WO01: E1000-2500/N5000-6500. WB01: E3500-5000/N2000-4000. Read BP-ENV101 for their instructions.
G01South boundary opening E8000-10000.

Legend

MarkMeaning on this sheet
Grey rectangleExisting exercise apron.
Teal outline/fillProposed SO01 building or PW01 path; read the tag.
Dashed blue line / WIndicative water route, unverified.
Dashed green circleT01 protected zone.
Brown outlined areasExisting BP-01 environmental-control areas.
Thin outlineSite boundary; location model only.
N arrowNorth; not automatically the top of every drawing in another project.

Interfaces and limits

  • The office abuts EA2's north edge. D01 faces EA2; the drawing does not establish a built connection.
  • SO01 FFL 100.300 is 285 mm above EA2's stated centreline level 100.015. Read the apron crossfall in BP-01. A compliant landing, approach and threshold have not been designed.
  • The indicative water route at E10500 is 500 mm east of the office's eastern outside face. This offset is a reading fact, not a service clearance or permission to excavate.
  • Read BP-01 for PW01 dimensions, joint layout, levels and environmental controls. SO01 describes the proposed office; it does not specify changes to the path.
  • These documents do not establish structural adequacy, foundations, services, drainage connection, fire, energy, ventilation, accessible access or building approval.