Construction drawings / SO01 site office

Section A-A and material references

SO-A401R0117 October 2026BP-01 / SO01

Fictional training document. Use the edition assigned by your assessor. Not for construction or site access.

SO-A401: Section A-A and material references. Complete structured text equivalent follows.
SO-A401 R01, 17 October 2026. A3 at 1:25. Fictional training source; use your assigned edition.

Section A-A and viewing direction

SO-A401 R01, A3 at 1:25. A-A comes from SO-A201, cutting north-south at site E6500 and looking west. South is left; north is right. It cuts the office and W01. The outside-face depth is 3000.

Vertical relationships

ItemLevel or dimension
Floor and ceilingFFL100.300 to ceiling103.000 = 2700 clear height.
South roof edge103.300 = 3000 above finished floor.
North roof edge103.600 = 3300 above finished floor.
Roof rise300 across 3000; no roof-member design is given.
W01 sill and head101.200 and102.400, therefore 900 sill above floor and1200 opening height.
Slab illustration100 nominal thickness, floor top100.300 and underside100.200; no reinforcement or support design.
Ground planeEL100.000 applies to this section only. It is not a surveyed site surface or a grading instruction.

Follow the material references

F01 is the office floor finish; C01 is the ceiling finish. EC01 and RF01 describe the schematic wall and roof envelope. Read SO-SC01 finishes and SO-SP01 materials. Grey/hatch marks cut material; thin lines are visible/reference edges and the dashed ground is diagrammatic.

What this cut does not establish

There are no designed footings, reinforcement, load capacities, framing/member sizes, bearing conditions, bracing or connections. The nominal slab and wall dimensions are reading facts, not a safe design. Do not select construction materials or methods by scaling this drawing.