Construction drawings / SO01 site office

Issue and source register

SO-IR01R0117 October 2026BP-01 / SO01

Fictional training document. Use the edition assigned by your assessor. Not for construction or site access.

Check the current document set

This register lists the SO01 documents for revision R01. Match the document number, revision and date before combining information from different sheets. “Current in this set” identifies the version to read; it does not authorise construction. All documents needed for the SO01 practice activities are listed here.

IDDocumentRevisionDateStatus
SO-A101Proposed site-office locationR0117 Oct2026A3 1:100; current in this teaching set
SO-A201Proposed floor plan and tagsR0117 Oct2026A3 1:25; current in this teaching set
SO-A301External elevationsR0117 Oct2026A3 1:50; current in this teaching set
SO-A401Section A-A and material referencesR0117 Oct2026A3 1:25; current in this teaching set
SO-SC01Door/window/finish schedulesR0117 Oct2026Current in this teaching set
SO-SP01SpecificationR0117 Oct2026Current in this teaching set
SO-IR01Issue/source registerR0117 Oct2026Current in this teaching set
SO-LG01Teaching guideR0117 Oct2026Current in this teaching set

Connect the related documents

DocumentUse it to readKeep in mind
BP-A101, BP-ENV101, BP-S201/S202, BP-SP01 R01 (16 Oct2026)The yard and path positions, levels, environmental controls and requirements.Use the BP-01 project pack for these site and path details. Read SO-A101 for the office location.
SO-A101/A201/A301/A401 and SO-SC01 R01The office location, room arrangement, openings, levels and finishes.Follow tags and section references between the drawings and schedules; read SO-SP01 for written requirements.
C1/C4 R04 case drawingsExisting conditions at Banksia House and Riverbend, which are different projects.Check the project identity. Dimensions and specifications from those sites do not apply to SO01.
AS1100.301-2008, Technical drawing - Architectural drawingA reference for architectural drawing conventions.Use the legend and notes on each supplied sheet to interpret its symbols and lines.

Check information before using it

  1. Read the project and drawing title to confirm that the sheet answers your question.
  2. Match the drawing number, revision and date to this register.
  3. Follow a tag or section reference to the named document and check its identity too.
  4. Compare written dimensions, levels and specifications. Record any conflict or missing information and ask for clarification.

A current drawing can still contain a stated limitation or an unresolved design detail. Check its notes before using it to describe work.