Construction drawings / SO01 site office

Door, window and finish schedules

SO-SC01R0117 October 2026BP-01 / SO01

Fictional training document. Use the edition assigned by your assessor. Not for construction or site access.

Door schedule

Tag / locationNominal opening W x H (mm)Material / operationLimit
D01 / South external wall1000 x 2100Painted solid panel leaf in metal frame. Hinged at west jamb, opens inward to R02.Nominal opening sizes, not clear-access or procurement sizes; access/threshold design unresolved
D02 / Internal partition900 x 2100Painted flush leaf in timber frame. Hinged at south jamb, opens into R01.Nominal opening sizes, not clear-access or procurement sizes

Window schedule

Tag / locationNominal W x H / sill above FFL (mm)Material / operationLimit
W01 / North external wall1800 x 1200 / sill 900Aluminium-framed fixed glazing. Fixed.Glazing grade, weatherproofing, energy and safety design not established
W02 / East external wall1200 x 1200 / sill 900Aluminium-framed fixed glazing. Fixed.Fixed glazing does not establish ventilation compliance

Room and finish schedule

RoomFloorWallsCeiling
R01 OfficeF01P01C01
R02 Entry / storeF02P01C01
Finish tagFictional specification
F01Carpet tiles, mid-grey, office only. Product, adhesive and substrate requirements subject to selection/review.
F02Sheet resilient vinyl, charcoal, entry/store only. Do not assume a tested slip classification.
P01Painted plasterboard lining, off-white; two finish coats over compatible prepared/primed substrate.
C01Painted plasterboard ceiling, white, at EL103.000; supporting system not designed here.

How to use the schedule

Find the tag in SO-A201, read its schedule row, then coordinate the relevant elevation/section. A room tag tells you where a finish applies. The door/window width is a nominal opening, not an actual leaf dimension, clear passage width or ordering instruction. Read SO-SP01 for workmanship and unresolved performance requirements.