Briefing extract held in the working folder
Project BP-01 — earlier proposed path brief: “Allow a 1200 mm wide pedestrian concrete path between EA1 and EA2. Overall path length is 8000 mm. Refer to the project drawings and specification for the eventual issued requirements.”
This record preserves an earlier proposal. Check its revision/status against BP-IR01 and the current sources before using it. Follow BP-WI01 for conflicting information. No work was constructed under this note.