A drawing set describes the same project in several ways. Each view answers a different question. Our example is S O zero one, a fictional proposed site office in the B P zero one yard. Before comparing views, check the project, drawing number and revision in each title block. The drawing set is revision R zero one. Its issue register identifies the sources that belong together.
Start with the site plan, S O A one zero one. It locates the office against the boundaries and retained features. The office is five metres wide and three metres deep, beside the northern apron. This establishes a position in the teaching model. It does not prove an underground service clearance or permission to build.
Now use the floor plan, S O A two zero one. A floor plan looks down through the building. It shows two rooms, wall positions, openings and written dimensions. A door arc indicates the direction of its swing. The tag D zero one identifies the entrance door. Follow that tag to the opening schedule. It gives a nominal opening of one thousand millimetres wide by two thousand one hundred millimetres high. Nominal opening size is different from a verified clear passage or an ordering size.
An elevation shows an outside face. On S O A three zero one, the north elevation shows window W zero one. The schedule identifies fixed glazing and its opening size. Fixed glass does not establish that ventilation requirements have been met. A section shows a cut through the building instead. Follow the A to A reference on the floor plan to S O A four zero one. It cuts through the office and north window. The finished floor level is one hundred point three zero zero. The ceiling is one hundred and three point zero zero zero. Their difference is two point seven metres. These are levels on a fictional local datum.
Use schedules and the specification to complete the reading. The office floor tag F zero one leads to carpet tiles. The entry and store tag F zero two leads to sheet vinyl. Read the finish, material and reference together. A coloured surface alone cannot establish the specified product.
Finally, inspect the limits. The office floor is two hundred and eighty-five millimetres above the stipulated apron centreline. A suitable approach, landing and threshold have not been designed. Structural, service and approval information is also incomplete. Record those gaps rather than inventing a solution. When you can view the screen, trace one opening through its plan, elevation and schedule, then explain what each source adds.
Source documents
- index.html
- site.html
- floor.html
- elevations.html
- section.html
- schedules.html
- specification.html
- register.html
Fictional training examples. Use the edition assigned by your assessor. Listening is not assessment evidence.